6 MMSCFD Two stage Membrane Unit
Services Included : Other , CO2 Removal – Membrane
Project Details
- Project Location : New Jersey

Project Description
Map Location
- Other Similar Projects
- CO2 Removal – Membrane
- 5 MMSCFD Two-Stage Membrane Plant for CO2 Removal
- Membrane Unit & Dehydration Unit
- 1 MMSCFD TEG Dehydrator & Two Stage Membrane Unit
- Membrane Unit
- Two-Stage Membrane Unit for CO2 Removal
- Single Stage Membrane Unit for CO2 Removal
- 2 stage 5,500 MSCFD membrane plant
- H2S Removal System
- 5 MMSCFD Membrane Plant for CO2 Removal
- 5 MMSCFD Membrane Plant for CO2 Removal
- Dehydration and Membrane Unit
- 10 MMSCFD Two-Stage Memebrane Plant for the Removal of CO2 in the Gulf of Mexico
- Membrane Plant for Landfill
- Membrane Plant
- Membrane Unit
- Other
- 15 GPM Amine, Mol Sieve System, Refrigeration Plant, NRU Plant
- Natural gas gathering, transportation, and compression.
- Contract Treating Job - East Lawton, OK
- 25 MMSDFD Dual Condensate Stabilizer
- 110 GPM Amine Plant
- 160 GPM Amine Plant
- Membrane Unit & Dehydration Unit
- 325 GPM Selexol-Type Plant for Landfill
- 6 MMSCFD Two stage Membrane Unit
- LNG from Landfill Gas
- Mol Sieve Dehydration and Dew Point Recovery Plants
- LNG Plant Front End Treating and Dehydration
- Nitrogen Rejection Unit for Tucumcari Basin, NM
- 2 stage 5,500 MSCFD membrane plant
- H2S Removal System
- 7.5 MMSCFD Nitrotech and X-O2 Unit
- Dehydration and Membrane Unit
- Nitrogen Rejection Unit
- Inlet Gas Dehydration Plant for 200 MMSCFD
- H2S Scavenger System for SulfaTreat Option
- 150 GPM Amine Plant
- Nitrogen Rejection Unit
- Mercury Removal Unit
- 2000 bpd Condensate Stabilizer Plant
- Nitrogen Rejection Unit for 8 MMSCFD
- Landfill Gas Treating Unit
- Dewpoint Recovery and Stabilization Plants
- LNG Plant Front End Treating and Dehydration
- CO2 Removal – Membrane
For more information on Amine Treating Plants from Newpoint Gas, LP,
contact us at
1-866-964-4558 or contact@newpointgas.com
contact us at





Larger Font
Smaller Font
