Minimizing the foot print and weight are the design parameters given to Newpoint for a FLNG pretreatment facility.
LLOG Exploration Company, L.L.C. will receive a 10 MMSCFD two-stage membrane plant for their offshore CO2 removal needs
Elmridge Resources, with the installation of a dual column condensate stabilizer to an existing process plant, will be capable of stabilizing up to 300 BPD of condensate into a Y-grade product
Back to All News