A dual column condensate stabilizer was designed and built for Elmridge’s large gas processing plant at Ignacio, to enable them to stabilize up to 300 BPD of condensate.

Services Included: Other
25 MMSDFD Dual Condensate Stabilizer
Project Location: Ignacio, CO
A Dual Condensate Stabilizer was developed by Newpoint to capture lost product and protect the environment by essentially eliminating all emissions and producing both an NGL and 10 RVP Condensate product.
