This study was completed at the request of a major natural gas company for a system in the Caribbean to address site requirements, catalyst life vs. capital costs, process description, process and instrumentation diagrams (P&ID’s), process flow diagrams (PFD’s), and environmental impacts. This study, along with the results of the pilot plant, are the basis for the final design of the facility.

Conceptual study and Pilot Plant for a 450 MMSCFD Arsenic Removal facility
Project Location: Trinidad
