by Zane Rhodes Zane Rhodes No Comments

IMG 0576s

A new 350 gpm amine plant and hot oil system was delivered to NW Oklahoma.  The planted is treating 120 MMscfd from 1.15 mol% carbon dioxide to the less than 50 ppmv.  Utilizing modular design, the interconnecting piping was installed in 1.5 days with a two person crew.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.